Wednesday, 29 March 2017

Reassembly of the rear suspension

29th March 2017: the swing arms required small repairs for the handbrake cabling, anti-roll bar ball joints added, repainted (again), bearings pressed in and oil seals fitted, and handbrake re-assembled.




Tuesday, 27 December 2016

Reconditioned hubs

27th December 2016... From Sierra Madre Porsche in California


Tuesday, 7 June 2016

Tuesday 7th June 2016: Front lenses arrive from California with rubbers, brass inserts and bolts.

Tuesday, 17 May 2016

17th May 2016: restoration of a pair of Lobro driveshafts.  POR15 painted shafts, new boot and flanges (here test-fitted to one of the shafts), to be re-assembled and greased.


Monday, 8 June 2015

Monday 8th June 2015.  Here's the fuel sender unit after clean-up and assembly.  Replacing and re-soldering the internal resistance wire float runners and the warning light circuit makes cleaning the internals much easier.  Using a micrometer, I discovered the thickness of the resistance wires are 0.1mm for the float and 0.27mm for the warning light.