Sunday 31 July 2011
Pedal box
Wednesday 27 July 2011
Saturday 4 June 2011
Brakes and front hubs
All set to dismantle the suspension in due course.
Sunday 15 May 2011
Gauges sent for restoration
The five dashboard gauges are sent to North Hollywood Speedometer for restoration. Their assessment to follow...
Monday 4 April 2011
progress report March 2011
Handbrake and gear-lever back from platers and re-assembled. The base plates are still to be finished in black and the handle chromed. Door striker plates plated and re-assembled with new internal mechanisms.
The dash, gauges and wiper-mechanism are removed. The dash is stripped down and will be recovered. The gauges are boxed for now while I evaluate options. The wiper-mechanism is stripped and clearned and parts separated for plating and/or paint.
The pedal board has been re-assembled: satin black finish over sanded and treated wood (still in great condition). The pedals are sent to California to be professionally refurbished.
The shell is not almost bare inside - except for a day's work to chip away at the remaining sound deadening.
Saturday 5 March 2011
Sunday 16 January 2011
Sunday at the garage
The strip-down continues. The interior is now part-removed: seats, belts, carpets and mats, handbrake, gear-lever etc. I've still to remove the sound-deadening material and the dash and instruments.
The doors are stamped with the last three digits of the chassis number - nice touch.
The car has an original Webasto heater - here's a photo prior to removal (...so, if ever I decide, I can remember how to put it back one day!)
Saturday 15 January 2011
Saturday 8 January 2011
Brightwork parts prior to re-chroming and zinc plating
Sunday 2 January 2011
Subscribe to:
Posts (Atom)