progress report March 2011




Handbrake and gear-lever back from platers and re-assembled. The base plates are still to be finished in black and the handle chromed. Door striker plates plated and re-assembled with new internal mechanisms.


The dash, gauges and wiper-mechanism are removed. The dash is stripped down and will be recovered. The gauges are boxed for now while I evaluate options. The wiper-mechanism is stripped and clearned and parts separated for plating and/or paint.

The pedal board has been re-assembled: satin black finish over sanded and treated wood (still in great condition). The pedals are sent to California to be professionally refurbished.


The shell is not almost bare inside - except for a day's work to chip away at the remaining sound deadening.